New England Power/National Grid (NEP) has announced they will conduct environmental survey work in and around the existing New England Power transmission right-of-way between Monroe and Londonderry, New Hampshire. Residents may see environmental flagging and GPS work near wetlands and streams and in other locations as the contractor performs their duties. Vanasse Hangen Brustlin Inc (VHB) is the authorized contractor and will be accessing the right-of-ways for the remainder of the fall of 2017 and possibly the spring of 2018.
For more information about this product, download this attached letter from New England Power/National Grid.