A
sincere and special "Thank You" to all who have made this clean up and
repair possible. It's times like this when a disaster strikes, that the
residents in the Community rise to help each other. This is what makes
Wentworth a great place to live.
Larry King - Donation & use of Front End Loader from Precision Lumber
Noel King - Assisted with equipment operating and supervisory support.
Jared King - Operator of personal Excavator on Beech Hill, Atwell Hill and Ellsworth Hill Rd.
Dave Thompson - Trucking
Dave Craviero - Trucking
Brian DuBois - Trucking
Paul Davis, Sr. - Trucking
Paul Kelley - Trucking
Larry Taylor - Operator / Trucking
Craig Scheller - Operator of Loader, Highway Dept.
Scheller Farm LLC - Operator (Todd) / Excavator on Nichols Hill Rd.
Ed Cadreact - Trucking / Operating Excavator on Ellsworth Hill Rd.
Wentworth Highway Crew of (3)
Jeff Ames - Fire Chief / Emerg. Mgmt. Dir
Select Board Members: Chris Bassingthwaite, chair, Raymond Youngs, & Tracy Currier
Administrative Assistant - Arlene Patten
Dover, NH sent (3) 10 Wheel Dump Trucks
Greenfield, NH sent (1) 10 Wheel Dump Truck & (1) Operator-Road Agent
A special "Thank You" to the following businesses for materials:
Cadreact Construction - Pike, NH
Warren Sand & Gravel - Warren, NH
Chief Crushing & Excavation - South Ryegate, VT
Carroll Concrete - Plainfield, NH
Pipe Connections - Center Harbor, NH
Road conditions as of 7/25/2017:
Beech Hill - Back to finished grade
Nichols Hill Rd. - Back to finished grade
South Wentworth Roads - Suffered minimal damage, back to finished grade
East Side Rd. - minimal damage and has been repaired
Ellsworth Hill Rd. - repaired all the way to Camp Victory, replacement of 108"x30' culvert
Atwell Hill Rd. & Cape Moonshine Roads under finished grade construction this week and next week